Vibration in Research Areas and Laboratories
Projects 2018
-
Ruhr-Universität Bochum, Campus Mark 51°7
Preliminary vibration study for a new research building.
-
University of Siegen
Site evaluation for the construction of a new lab building (vibrations and magnetic fields) including several sensitive microscopes.
Projects 2017
-
Fritz-Haber-Institut Berlin
Vibration measurements in laboratories and site evaluation.
-
Fraunhofer ILT, Aachen
Vibration study for the installation of a 3D-EHLA (Extreme high-speed laser material deposition) machine.
-
ProDi Health Campus Bochum
Vibration analysis and consulting for the installation of a power generation plant.
-
Forschungszentrum Jülich
Vibration measurements and consulting for the construction of a new heating supply center.
-
IMSE Heidelberg
Vibration measurement and evaluation, conceptual design of a new research building including highly sensitive SEM, XPS, AFM and precision scales.
-
EMBL-Heidelberg, new building ITC
Dimensioning of the building for the low-vibration installation of 4 TEMs, several SEMs as well as different optical microscopes.
-
Fraunhofer IAP PYCO, Wildau
Preliminary studies for the conceptual design of a new building.
-
Bergische Universität, Wuppertal
Vibration measurements in laboratories during milling works.
Projects 2016
-
Fraunhofer WKI, Braunschweig
Dynamic investigation of ambient ground vibrations, vibration prognosis and dynamic conception of the new ZELUBA building, followed by a variation study of slab frequencies in the planned laboratory areas.
-
CAU, Kiel
Conception for the construction works of the new Institute of Geosciences. Dynamic building conception and basic engineering für the new animal housing and physiology building.
-
EMPA Ersatzneubau PAV Eawag Areal, Zürich, Swiss
Investigation of vibration immissions on the ground and in the existing buildung for detailed planning of a new laboratory building.
-
EMBL Heidelberg
Building concept to minimize vibrations and low frequency electromagnetic interferences in the new TEM laboratory.
-
Fraunhofer HHI Berlin
Vibration study for a lithography laboratory.
-
Fraunhofer IWU Chemnitz
Vibration study to retrofit a tool pedestal.
-
RWTH Aachen, IMM
Concept for minimisation of low-frequent magnetic fields in a Nano Tech Lab.
-
University Hamm-Lippstadt, Campus Lippstadt
Dynamic investigations and consulting concerning the installation of a climate-testing stand with electrodynamic shaker. Determination of dynamic parameters based on measurements with shaker Butterfly.
-
University Münster
Site evaluation with ground vibration measurements for the new physics building IG1.
Projects 2015
-
Universität Freiburg
Expert report on the influences of external vibrations and electromagnetic fields due to a tram line on the institutes IMTEK and FIT of University Freiburg.
-
University Cologne
Location evaluation inside the building shell of building 310b of the geosciences. Documentation of the measurements of vibrations and electromagnetic fields.
-
University Osnabrück
Conzept for minimisation of low-frequent magnetic fields in a TEM labororatory, new research centre CellNanOS.
-
RWTH Aachen, Campus Melaten
Dynamic concept for minimizing vibrations and electromagnetic fields in a SEM laboratory, Cluster Integrative Production Technology.
Projects 2014
-
University Heidelberg
Consulting concerning vibration isolation for the new campus line in Heidelberg, faculties of physics and geosciences.
-
RUB, Bochum
Consulting during the planning phase for laboratory buildings (ZGH, NA, IA-IB, etc.) of the RUB University.
-
Proteinzentrum, MLU Halle
The new Protein Centre at the Martin Luther University in Halle will colocate laboratories with vibration sensitive equipment of different faculties. Consulting during planning phase and optimisation of the installation of vibration sensitive devices.
-
Fraunhofer IAF, Freiburg
Location evaluation for the installation of highly sensitive equipment.
-
Hochschule Niederrhein, Krefeld
Site evaluation for the relocation of laboratories of the Faculty of Chemistry.
-
Max-Planck-Institut Dortmund
Site evaluation for a new TEM area of the MPI of Molecular Physiology.
-
Cfaed, TU Dresden
On the location site of the Barkhausenbau at TU Dresden University will be built a new institute. There will be available 3250 sqm of laboratory and office areas for the Faculty of Physics and the Center for Advancing Electronics Dresden (cfaed).
-
Universität Koblenz-Landau
Vibration measurements and dynamical design to provide the full usability of the new laboratory building for the Faculty of Natural and Environmental Sciences.
-
LASE, TU Kaiserslautern
New research building LASE (Laboratory for Advanced Spin Engineering) of the TU Kaiserslautern University . Assessment of the dynamical situation of different possible sites. The new building will also include the Nano Structuring Center (NSC). In the new building will therefore be colocated all local available devices for micro- and nanotechnological fabrication.
-
Fraunhofer ENAS
Site evaluation concerning structural dynamics, sound and EMI for the installation of sensitive tools in the ALD clean room.
-
TU Dresden, Forschungsgebäude DZNE und BCUBE
Consulting during the planning phase and dimensionning of the foundation for the planned research building.
-
Fraunhofer IPMS
Placement evaluation concerning structural dynamics, sound and EMI for the installation of a SEM.
-
RWTH Aachen, Elektrotechnik
Dynamic conception of the new building for the Faculty of Electrical Engineering. There will be a separate cleanroom connected with the institute by an extra building.
Projects 2013
-
European XFEL Hamburg (DESY)
Consulting and measurements with vibration prognosis for an underground experimental room including different tool foundations necessary to conduct experiments with extremely short and powerful X-ray flashes.
-
MAIN TU Chemnitz
Dynamic conception of the new MAIN (Materials, Architecture and Integration of Nanomembranes) for vibration sensitive usage (REM). Measurements and structural conception.
-
Fraunhofer IML, Dortmund
Modification of an existing experiment hall. Measurements, simulation and structural conception.
-
ZEMOS Ruhr Universität Bochum (RUB)
Preliminary study for the concept planning of the new research building ZEMOS. Dimensioning of the foundation for the laboratory area and dynamic consulting in placement of laboratory equipment and building services.
-
IJS Joszef Stefan Ljubljana, Slovenia
Design of the structural elements of the new research building in the way that the building will offer an optimal performance for the installation of vibration sensitive equipments and devices.
Tieftemperaturlabor at PTB Berlin
Dynamic conception for a building with a vibration sensitive Low Temperature Kryostat and REM usage. Measurements, simulation and structural conception.
Projects in 2012
-
Fraunhofer IMS Duisburg
Site evaluation concerning soil vibrations for the placement of an AFM in the Fraunhofer IMS in Duisburg.
-
Infineon - Fraunhofer CNT Dresden
Dynamical site evaluation for the relocation of vibration and EMI sensitive tools of the Fraunhofer CNT Dresden.
-
Fraunhofer IOF Institute, Jena
Examination of the structural dynamics of the specially designed foudations of the IOF Jena.
-
Karlsruher Institut für Technologie (KIT)
Vibration Measurements and evaluation of the planned structural system of the MZE building on the KIT campus.
-
New building IA-IB, Ruhr Universität Bochum (RUB)
Site evaluation for the installation of highly sensitive microscopes (SEM/TEM) in the new laboratory of the (ZGH) intstitute.
Projects in 2011
-
Leibniz University Hannover
Preliminary investigation of structural dynamics and pre-dimensioning for the new building of Testing Centre for Load-bearing Structure.
-
MPI für Eisenforschung, Düsseldorf
Measurement of ground vibrations and sound immissions for the evaluation of the installation area of a Jeol TEM.
-
Plastic Logic, Dresden
Dynamic design of the foudation of a Zeiss AURIGA CrossBeam workstation and acceptance measurements.
-
National Institute of Chemistry (NIC), Ljubljana, Slowenia
Dynamic evaluation of the location for the new TEM laboratory.
-
Max-Planck-Institute Dresden
Conceptual dynamic design for the new TEM laboratory.
-
Max-Planck-Institute Heidelberg
Expert consulting services concerning the dynamic effects of the new tram route.
-
Centre for Advanced Materials (CAM), Heidelberg University
Dynamic design layout for the new construction.
Projects in 2010
-
Fritz-Haber-Institut der Max-Planck-Gesellschaft, Berlin
Expert consulting services concerning a new building for a cleanroom.
-
Fraunhofer IZM, Dresden, ASSID
Dynamic concept of a special foundation for several vibration sensitive tools. Vibration measurements, dynamic dimensioning of the foundation and acceptance measurements.
-
Technikum Dresden
Dynamic design of the new Technikum building (TU Dresden).
-
Insel Bern
Conceptual dynamic design and feasibility study for a new Laboratory.
-
Fraunhofer Itzehoe
Cleanroom ISIT 2, dynamic design of the construction.
-
Research Centre Jülich
Expert consulting concerning structural dynamics of the complex Helmholtz Nanoelectronic Facility (HNF).
Projects before 2010
-
Fraunhofer Aachen (2009)
Expert consulting concerning structural dynamics of the new high-tech production centre (IPT and ILT).
-
Institute of Analytical Science, ISAS, Dortmund (2006–2008)
Dynamic dimensioning of the new construction and foundation including measurements, prognosis and final verification measurement.
-
DFG-Centrum für funktionelle Nanostrukturen CFN (2005–2008)
Conceptual dynamic design of the new building. Special design for the basement reducing low frequency vibration effects (≤ 10 Hz).
Vibration mearurements and consulting concerning vibration specifications. -
Institute for Nano Research, Havanna, Cuba (2007)
Dynamic concepts for the new nano research building and dimesioning on the basis of subsoil vibration measurements.
-
Max-Planck Institut, Dresden (2007)
Interference elimination of Omicron SEM
-
Qimionda/Uni Dresden MALAB Research laboratory (2006)
Examination of the foundation by measurement and analysis. Conceptual design including measurements before and after commissioning and vibration isolation dimesioning.
-
IMS Fraunhofer, Duisburg (2005)
Design of the dynamic modification for the reconstruction of an existing building. Measurements before and after reconstruction phase.
-
Max-Planck Institute Dresden (2004)
Consulting concerning reduction of vibrations caused by a nearby heavy impact test device. Final control measuring.
-
National Institute for Biological Standards and Control NIBSC, England (2004)
Extensive measurements for the reconstruction of NIBSC building, England
-
University Bielefeld, new building for genetic research(2003)
Dynamic dimensioning of the new building with vibration requirements Nano-D for most senitive reseach instruments. Subsoil vibration measurements and final control measurements included.
This list of references contains selected projects and is not complete.
Download references: Research Buildings